Library Construction Summer 2018

Under Construction is the theme for summer 2018. The library lobby is being transformed into a cafe with seating capacity of over 80 people. What does the cafe mean for the library? The library's patron facing services are relocating to the lower level of the building.  Pictures to be posted soon. 

When visiting the library this summer, enter the building via the glass doors located off the circle.  The temporary library desk is located in front of the reference section. Please pardon our appearance, noise and dust as we work hard to make everything ready by August. 

Stay tuned to our facebook, twitter and instrgram accounts for updates on the project .

EDS_SearchBoxTest

Search Library Collection

EDS_SearchBoxTest_adjust width and height

Search Library Collection